Chain control flows?

Chain control flows?

Hi,

Is it possible to chain control flows?

I have two control flows, Control Flow A and Control Flow B.

When Control Flow A finishes, I would like it to start Control Flow B?

Is that possible?  I know I could just combine them into one large control flow, but I would rather keep them as two separate control flows that I could independently run if needed.

thank you